TLDR connecting far-flung regions into one huge grid can mitigate the intermittency of renewables. High-voltage direct current is a good way to do this.

  • iie [they/them, he/him]
    hexagon
    ·
    edit-2
    1 year ago

    The 1,208 km euro-asia subsea power cable will carry 2000 MW of power and cost $745,000 per km, $900 million total

    For comparison, this 2013 80% efficient scalable flywheel design costs around $1333 per kW. Handling 2000 MW would cost $1333 x 1000 x 2000 = $2.7 billion

    The costs are comparable, but the 1,208 km euro-asia HVDC cable wins unless I fucked up my math or misunderstood how flywheel cost works

    The length where flywheels overtake cables is $2.7 billion / $745,000 per km ≈ 3600 km, so flywheels might beat a trans-Atlantic cable, depending on the route