This wall was to the supply room with all of the uniforms and PPE. The building was constructed in the mid-20th century so it turns out it's full of asbestos. Thanks mole man.

  • happybadger [he/him]
    hexagon
    ·
    7 months ago

    Don't get me wrong, it's a massive investment to remove it all. At the same time though most if not all of the water pipes in the country were once made out of lead. If we don't remove those pipes then any town can become Flint, Michigan if the water chemistry changes. There's a public health imperative to clean it up before a freak accident happens in one of 80 schools in your district alone.

    • Acute_Engles [he/him, any]
      ·
      edit-2
      7 months ago

      It's a slow process for sure and if someone has to nail a picture to a wall they have to call my boss with 2 days turnaround time for a test