spoiler
In this episode, Sal Mercogliano - maritime historian at Campbell University (@campbelledu) and former merchant mariner - discusses the planned deployment of the Joint Logistics Over The Shore capability to Gaza to construct a pier to aid in the flow of aid into the region.
00:00 Introduction
03:59 Geography of Gaza
06:10 First shipments by sea
07:24 Joint Logistics Over The Shore JLOTS
09:10 Floating Pier
13:05 Pier Options Ashore
16:48 Ship to Shore Connectors
23:03 Historical Examples - WWII & Vietnam
25:09 Where Are Marine, Navy & Army Assets
27:37 Conclusion
Some good supplemental overview from a merchant mariner who has done this kind of pier system before.
[stares in Mavi Marmara]