• Downanotherday [he/him]
    ·
    edit-2
    4 years ago

    You don’t even really need a vice or pipe.

    My concrete kids forgot to bring fucking every tool to a site. I just lifted a skid steer bucket off the the ground, put the rebar in between the ground/bucket and used the length of rebar as leverage.

    You would waste a bunch of material building them this way. But that shit is pretty much free at every construction site after hours.